I’ve just scrolled back a page or to of this thread and realize that things have moved on with the work to the back bedrooms, so here’s some update pics. Not finished - finished yet … but pretty close.
for the bathrooms, we just need to buy 2 toilet systems, 2 washbasins & vanity units and 2 heated towel-rail thingies and plumb them all in…
For the bedrooms, some light switches, ceiling and wall lights, power outlets and re-assemble the beds.
Both rooms are at the same stage…
job done (almost)
for the bathrooms, we just need to buy 2 toilet systems, 2 washbasins & vanity units and 2 heated towel-rail thingies and plumb them all in…
For the bedrooms, some light switches, ceiling and wall lights, power outlets and re-assemble the beds.
Both rooms are at the same stage…
job done (almost)

Attachments
Last edited: